Hidrovetes Ltd. introduced the hydro seeding technology to
Three test sights were chosen.
The first was the rock covered slopes at the Hanifah Dam Park in

Irrigation for the hydro seeded area began in the evening after the area was seeded.
Irrigation for this area depended on the temperature. Many short intervals of watering brought the best results. A minimum of 5 x 10 minute watering intervals was suggested per day and if the temperature increased above 30 degrees Celsius than additional night time irrigation was recommended.
RESULTS:
A picture is better than a 1000 words!

The second site: Al Elb Dam Park

Neither area was seeded with grass seed. Desert bushes were planted instead.
After a period of about two weeks the bushes started to grow:
The gorge goes through the entire capital of
A river in the center of the desert is quite the phenomenon! 
Therefore the city is in the process of making a park along almost the entire extent for people to go picnicking and hiking. 
The lower level is also being prepared. This will take years of preparation, but many areas are already in use. It is packed with people on the weekends. We weren’t able to work on the weekends because of the tourists!
The third test site was at the Riyadh City Nursery.
The city officials wanted to see how hydro seeding was implemented and wanted to watch the results day by day. Therefore they asked us to do a very small area right in front of their offices.

City officials were quite impressed and therefore HydroHome will be seeding a highway exit area in downtown

The work began in April of 2009 and finished in the beginning of May. Take a look at the pictures and decide whether or not it was a success!
Exit 13:
April 15, 2009:
May 8, 2009:
June 3, 2009: